NINE CANBERRA NEWS BUREAU

 
 

PROJECT INFORMATION:

Concept Design
Design Development
Detailed Design
Development Consent
Construction Phase Services

NINE CANBERRA NEWS BUREAU

The Channel 9 Canberra news bureau refurbishment project represents a pivotal evolution in media workspace within the Australian Parliament House building. This project transforms the traditional Nine newsroom into a dynamic, agile environment that meets the demands of modern broadcasting and sets new benchmarks for the industry in regional areas.

Brewster Murray’s design philosophy was to create a space that embodies the spirit of Channel 9's prestigious legacy while embracing the future of media production. The refurbishment focuses on:

• Enhancing collaboration among television, publishing, and radio teams.

• Integrating state-of-the-art technology seamlessly with the workspace.

• Maximizing natural light and open spaces to foster a vibrant and productive atmosphere.

• Building a flexible environment that can evolve with the changing media landscape.

The focus of the bureau is the new state of the art television studio which is equipped with cutting-edge broadcasting technology. This studio is designed to be versatile, accommodating a range of production formats and setups, reflecting Channel 9's commitment to excellence in news, entertainment, and live broadcasts.